YesPermit
Cover of Pole Barn and Agricultural Building Permit Plans, a YesPermit handbook

YesPermit handbook · PDF · 20 pages

Pole Barn and Agricultural Building Permit Plans

The same pole barn can be an exempt farm building, an accessory building that needs a full permit, or a house. This handbook gives the published rules of 14 counties and states, six Maryland counties among them; what the agricultural exemption covers and what cancels it; setbacks and size caps; posts, embedment, girts, trusses, snow and wind loads in the two pole barn designs that Snohomish County, Washington, and Laramie County, Wyoming, publish for building without added engineering (trusses aside); when an engineer is required; the pole barn turned into a home; and a sample site plan, post plan and section, the inspections, the fees and a setback worksheet.

$34 one payment

Get the handbook · $34

Full refund within 14 days, no reason needed. Refund policy

Secure payment by Stripe · instant download · invoice by e-mail

Verified · reviewed by industry professionals · 23 official sources, each dated · November 2026 edition

What you get

Contents

Look inside

Real pages of the handbook, as you will print them.

Page 1 of Pole Barn and Agricultural Building Permit Plans
Page 1
Page 2 of Pole Barn and Agricultural Building Permit Plans
Page 2
Page 9 of Pole Barn and Agricultural Building Permit Plans
Page 9

Made for you if

  • You are planning a pole barn, a post-frame garage or shop, or a barn for animals, hay or equipment, and want to know whether it needs a permit
  • You farm, or own agricultural land, and want to know whether your barn qualifies for the agricultural exemption and what paperwork remains
  • Your county asks for a site plan, a plan view, an elevation and a section and you want to draw them yourself

Common questions

Do you need a building permit for a pole barn?

Under the model code, yes above 200 square feet, unless it qualifies as an agricultural building: the IRC exempts one-story detached accessory buildings only up to 200 square feet, and Johnson County, Kansas, requires a permit from 200 square feet. Snohomish County, Washington, says pole buildings follow the same exemption rules as any other structure.

What are the pole barn permit exemptions for farms?

A building used only to house farm implements, hay, grain, livestock or similar products, never lived in, not open to the public. Several counties also look at the land: Washington County, Maryland, requires an agricultural tax assessment; Montgomery County, agricultural zoning and assessment. Cars, RVs or a lawn tractor inside cancel it in Mason County, Michigan.

Do I need a permit for a pole barn in Maryland?

It depends on the county. Carroll County requires a building permit for a pole building, with a $100 fee line for farm buildings on a bona fide farm; Frederick County issues a zoning certificate for an exempt agricultural building; Washington County an Agricultural Structure Certificate; Montgomery and Anne Arundel exempt qualifying farm buildings. The handbook compares six counties.

What drawings does a pole barn permit need?

A plot plan to scale with the distances to each property line, the well and the septic area, then a plan view, an elevation and a section through the wall showing the footing, the post and the connections, as Prince William County, Virginia, lists them; Carroll County, Maryland, adds post sizes and locations, the beam and the footing detail. Trusses come with their engineered drawing.

How do I get the PDF?

Right after payment you land on your download page. Bookmark it: it always holds the latest edition. If you lose it, write to us from the e-mail you paid with.

Get the handbook · $34

Full refund within 14 days, no reason needed. Refund policy

Secure payment by Stripe · instant download · invoice by e-mail

Rather hand over the whole file?

The handbook shows you how to do it yourself. If you prefer, YesPermit prepares the permit file for your address: your city's rule, the site plan, the drawings, the form and the fee. See the permit files.

Free articles on the same subject

Other handbooks

$3420 pages · instant PDF
Get it now