Building Permit Fees and Cost Handbook
The same 12 x 16 ft deck costs $50 to permit in Wharton, Texas, $214 in Frederick County, Maryland, and $616.19 in Pleasanton, California, if you take the published fee schedules at their word. The difference is the method: a flat fee, a price per square foot or a percentage of the value of the work, then plan review, technology fees, state surcharges and, for some projects, impact fees. This handbook explains each piece, shows it in the dated fee schedules of 18 cities, towns, townships and counties in ten states, and computes the fees line by line for five projects: a deck, a carport, a driveway with its curb cut, a kitchen remodel and a patio cover. With the re-inspection, revision, extension, refund and no-permit penalty lines side by side, a total budget worksheet, the questions to ask at the counter and an e-mail template to get a fee estimate before you apply.
$29 one payment
Full refund within 14 days, no reason needed. Refund policy
Secure payment by Stripe · instant download · invoice by e-mail
Verified · reviewed by industry professionals · 20 official sources, each dated · November 2026 edition
What you get
- A 19-page PDFNovember 2026 edition, 14 chapters and a workbook, printable on letter paper.
- 2 checklists and 4 worksheetsFill them in as you go: they become your project file.
- 3 drawings made for the handbookDimensioned the way a plan reviewer expects to read them.
- 20 official sources, datedEvery rule and number points to its source: statutes, code tables, city handouts and fee schedules.
Contents
- How to use this handbookp. 3
- 1. The six ways a permit fee is pricedp. 3
- 2. The 18 schedules side by sidep. 4
- 3. Valuation: how "the value of the work" becomes a feep. 5
- 4. Plan review, technology fees and state surchargesp. 6
- 5. Impact, school and development fees: when they reach a homeownerp. 7
- 6. Re-inspections, revisions, extensions and refundsp. 8
- 7. What starting without a permit costsp. 9
- 8. Worked example 1: a deckp. 9
- 9. Worked example 2: a carportp. 10
- 10. Worked example 3: a driveway and its curb cutp. 11
- 11. Worked example 4: a kitchen remodelp. 13
- 12. Worked example 5: a patio coverp. 14
- 13. The total budget worksheetp. 15
- 14. Questions to ask at the permit counterp. 16
- Where this handbook stopsp. 16
- Workbookp. 17
Look inside
Real pages of the handbook, as you will print them.



Made for you if
- You plan a deck, a carport, a driveway, a kitchen remodel or a patio cover and want to budget the permit before you apply
- Your city's fee schedule talks about valuation, plan review, surcharges and filing fees and you want to know what each line means and what it adds
- You want to compare a contractor's "permit allowance" with what the office will really charge, or know what starting without a permit would cost
The projects it covers, in pictures



Illustrative photos, published by their authors under free licenses. They are not our clients' projects.
Common questions
How much does a building permit cost for a deck?
It depends on the method your office uses. For the same 192 sq ft deck worth $12,000, the published schedules read give $50 in Wharton, Texas, $60 in Carroll County, Maryland, $214 in Frederick County, Maryland, $553.46 in Montgomery County, Maryland, and $616.19 in Pleasanton, California, once plan review and the standard surcharges are added (before Pleasanton's conditional surcharges). Chapter 8 shows ten jurisdictions line by line and flags the lines a schedule leaves unclear.
How is a permit fee calculated from the value of the work?
The schedule gives a base fee for the first part of the value and a rate for each additional $1,000 or fraction. Oakdale, Minnesota, for example: $85 for the first $2,000 plus $16.50 per additional $1,000 up to $25,000. Chapter 3 explains what the value must include and how offices check it, with a table for four project values in three jurisdictions.
What fees are added on top of the permit fee?
Often a plan review fee (25 to 100 percent of the permit fee in the schedules read), an application or filing fee per permit, a technology fee (5 to 10 percent), state surcharges in California, Minnesota and Florida, separate trade permits, and sometimes impact or school fees when the project adds floor area or a living unit. Chapters 4 and 5 list them.
How much is a permit for a patio cover?
For a 12 x 20 ft patio cover worth $7,000, the schedules read give $50 in Wharton, Texas, $190 in Anne Arundel County, Maryland, $305.01 in Oakdale, Minnesota, $470.72 in Pleasanton, California, and $554.14 in Manteca, California, or $291.69 there for an ICC or IAPMO approved kit. Chapter 12 has the calculations.
What does it cost if I build without a permit?
More than the permit. The schedules read charge double fees (Carroll County, Lower Salford Township, Jerusalem), an investigation fee equal to the building permit fees (Pleasanton), or rising penalties (Miami Lakes, Harford County). Chapter 7 lists them.
How do I get the PDF?
Right after payment you land on your download page. Bookmark it: it always holds the latest edition. If you lose it, write to us from the e-mail you paid with.
Full refund within 14 days, no reason needed. Refund policy
Secure payment by Stripe · instant download · invoice by e-mail
Rather hand over the whole file?
The handbook shows you how to do it yourself. If you prefer, YesPermit prepares the permit file for your address: your city's rule, the site plan, the drawings, the form and the fee. See the permit files.