Permit help prices in 2026: low and high market prices
In November 2026, published prices for deck permit drawings ran from $150 with an independent drafter to $2,450 with an architecture firm, and residential permit drawings started at $699. A permit expediter who files the application charges $349 to $599, drawings not included. A site plan alone costs $89 to $299. The city's permit fee comes on top.
Published · Updated
Editorial lead: The YesPermit team
Rather not do this yourself? We prepare your permit file for your address, and revise it until approved.
Get my permit · $499Key facts
- Canandaigua, New York, charges $0.30 per square foot with a $100 minimum for a deck or unheated porch permit in its 2026 fee schedule.[1]City of Canandaigua, New York, Fee Schedule 2026
- Oakdale, Minnesota, set its deck permit fee at a flat $160 for 2025, up from $154 in 2024.[2]City of Oakdale, Minnesota, Ordinance 942, Revising the Fee Schedule for 2025
- In New York City, the penalty for legalizing work done without a permit on a one- or two-family home is $600.[3]NYC Department of Buildings, Form L2 instructions
How much does help with a building permit cost in 2026?
We recorded the published prices of permit services on November 7, 2026, for small residential projects: decks, sheds, fences, pergolas, porches. They fall into three types of service, from the most expensive to the cheapest, before the city's own fee.
| Type of service | What you get | Low | High |
|---|---|---|---|
| Architecture firm, deck plan | Fixed fee for a small structural plan such as a deck; engineering and seals extra | — | $2,450 |
| Drafting and architecture service, residential permit drawings | Published starting price for a residential permit set | $699 | quoted by size |
| Online drafting services, deck permit drawings | Detailed deck permit drawings, starting price at two services | $450 | $450 |
| Independent drafter, deck up to 200 sq ft | Permit and construction plans for the deck | $150 | $300 |
| Permit expediter | Preparing and filing the application, one resubmission; no drawings, no city fee | $349 | $599 |
| Site plan alone, from an online drafting service | The lot, the project and its distances to property lines; no construction drawings | $89 | $299 |
| City permit fee for a deck (official schedules) | Paid to the city, whoever prepares the file | $100 minimum in Canandaigua, New York[1] | $160 flat in Oakdale, Minnesota (2025)[2] |
Prices are the ones published on public price pages, in US dollars, for the scope closest to a simple deck or small residential project. A larger or engineered project is quoted on request and costs more.
What is in each type of service?
Permit drawings
An architect or a drafter draws what the city reviews: the site plan, and the construction drawings of the project, with its footings, framing and dimensions. For a deck, the published prices we recorded were $2,450 at an architecture firm, $450 at two online drafting services and $150 to $300 at an independent drafter for a deck up to 200 square feet; a nationwide drafting service started residential permit drawings at $699. These are starting prices, not final quotes, and engineering, surveys and permit fees are billed separately.
A permit expediter
An expediter takes your drawings and handles the paperwork: the application, the filing, the follow-up and one resubmission if the city asks for changes. The flat fees we recorded were $349 per permit and $599 per project, with $79 for each extra revision round, $99 for rush processing and $49 for inspection scheduling. The expediter does not draw the plans, so you pay the drawings on top.
A site plan alone
Online drafting services draw a site plan from your address: the lot, the house, the proposed project and its distances to the property lines. The tiers we recorded ran from $89 to $299. It covers the "where" of the permit, not the "how": you still need construction drawings when the city asks for them.
A worked example: a 12 by 16 foot deck
Take a 192 square foot deck in Oakdale, Minnesota, where the 2025 deck permit fee is a flat $160[2].
- Architecture firm: $2,450 for the deck plan, plus the $160 fee: $2,610.
- Online drafting service plus expediter: drawings from $450, plus $349 for the filing, plus the $160 fee: at least $959, before any extra revision round.
- Online drafting service, you file: from $450 plus the $160 fee, so at least $610.
- YesPermit Permit Kit: $349 for the researched rule, the site plan, the dimensioned drawings and the form, plus the $160 fee paid to the city. You file it.
- YesPermit All-in: $499, plus the same $160 fee, with a review before you file and revisions after every city comment until approved.
- Do it all yourself: only the $160 fee, and your evenings. Hastings, Minnesota, for example, gives homeowners a deck plan worksheet and accepts an owner-contractor waiver when they do the work themselves[4].
In Canandaigua, New York, the same deck works out to $57.60 at $0.30 per square foot, so the $100 minimum applies[1].
What costs do people forget?
- The city's permit fee. None of the services above include it. It is set by your city's fee schedule[1][2], and a driveway can add a separate public works fee, compared across eight schedules in what a driveway permit costs.
- Extra revision rounds. One resubmission is often included; after that, one expediter charges $79 per round.
- An engineer's stamp. Drafting services quote it separately when the city requires it, for example on elevated decks or in high-wind areas.
- Rush fees. One expediter adds $99 to move a file to the front of its queue.
- Skipping the permit. In New York City, legalizing work done without a permit on a one- or two-family home carries a $600 penalty, and removing the work instead carries the same penalty[3].
Where does YesPermit fit?
YesPermit prepares the permit file for your address, so you get the drawings and the paperwork in one payment, without paying a drafter and an expediter separately.
Plans from a drafter: $150 to $699; an architect: up to $2,450. Our Permit Kit: $349, with the researched rule, a site plan, dimensioned drawings and the form, ready for you to file. If you only need drawings for a small deck and know your city's rules, an independent drafter can cost less.
- Permit Kit, $349: your city's rule researched for your address with its source, a site plan with distances to your property lines, dimensioned project drawings for the application, the documents list, the form and where to file it, the published fee and an HOA request template. You file it yourself.
- Kit + Expert Review, $399: the Permit Kit, and our permit team checks your complete file before you submit it, with up to 3 rounds of questions and answers.
- All-in, until approved, $499: the review, then revisions after every comment from the city until your permit is approved, for up to 6 months. Approved or your money back, under the conditions of our guarantee.
What we do not do: we are not architects or engineers, and we do not file the application for you. If your project needs stamped engineering drawings, we tell you at the start. The city's permit fee is paid to the city.
- Permit Kit$349
- Kit + Review$399
- All-in$499
Your permit file, prepared for your address
We handle the permit. You build your project.
- Your city's rule, for your addressThe code section, its link and the date we checked it.
- Site plan and dimensioned drawingsDistances to your property lines, ready for the application.
- The form, where to file it, and the published feePlus the documents list and an HOA request template.
- Reviewed, then revised until approvedWith All-in, after every comment from the city, for up to 6 months.
Common questions
How much does a permit expediter cost for a deck or a shed?
The published flat fees we recorded on November 7, 2026 run from $349 per permit to $599 per project for preparing and filing the application with one resubmission. Drawings and the city's permit fee are not included, and further revision rounds are billed extra.
How much do permit drawings cost?
On November 7, 2026, published prices for deck permit drawings were $150 to $300 with an independent drafter for a deck up to 200 square feet, from $450 with two online drafting services, and $2,450 with an architecture firm; residential permit drawings started at $699 with a nationwide drafting service. An engineer's stamp is quoted separately.
Can I draw my own permit drawings for free?
Often, for simple projects. Hastings, Minnesota, for example, gives homeowners a deck plan worksheet and accepts an owner-contractor waiver when they do the work themselves. What you save in money you pay in time, and a missing dimension or setback is the classic reason a file comes back.
Is the city's permit fee included in these prices?
No. The permit fee is paid to your city or county, whoever prepares the file. Canandaigua, New York, charges $0.30 per square foot with a $100 minimum for a deck in 2026, and Oakdale, Minnesota, charged a flat $160 for a deck in 2025.
What does the YesPermit Permit Kit cost and what does it include?
The Permit Kit is a one-time payment that includes your city's rule researched for your address, a site plan with distances to your property lines, dimensioned project drawings, the form, where to file it and the published fee. All-in adds a review before you file and revisions until approved, with a money-back guarantee.
- Permit Kit$349
- Kit + Review$399
- All-in$499
Your permit file, prepared for your address
We handle the permit. You build your project.
- Your city's rule, for your addressThe code section, its link and the date we checked it.
- Site plan and dimensioned drawingsDistances to your property lines, ready for the application.
- The form, where to file it, and the published feePlus the documents list and an HOA request template.
- Reviewed, then revised until approvedWith All-in, after every comment from the city, for up to 6 months.
Rather hire a contractor to build it?Tell us about the job: we pass your request to partner contractors in your area. No cost to ask, no obligation to hire.
Sources
- City of Canandaigua, New York, Fee Schedule 2026. Checked November 7, 2026.
- City of Oakdale, Minnesota, Ordinance 942, Revising the Fee Schedule for 2025. Checked November 7, 2026.
- NYC Department of Buildings, Form L2 instructions (penalties for work without a permit). Checked November 7, 2026.
- City of Hastings, Minnesota, Deck permit requirements. Checked November 7, 2026.