
YesPermit handbook · PDF · 23 pages
Detached Garage Permit Plans
Before you order trusses or pour a slab, the zoning office, the building reviewer and the electrical inspector each read a different part of your drawings. This handbook gives the published size caps, height limits, setbacks and distances to the house of 14 cities and counties, three Maryland counties among them, with the arithmetic to check your own lot; the slab, thickened edge or frost footing under chapter 4 of the International Residential Code; walls, door headers, bracing, trusses and snow; the floor slope and the slab height; the wiring of a detached garage under the National Electrical Code (one supply, one disconnect, one receptacle per bay, the trench); a sample site plan, slab section, elevation and wiring plan; the inspections, the fees and a setback worksheet.
$34 one payment
Full refund within 14 days, no reason needed. Refund policy
Secure payment by Stripe · instant download · invoice by e-mail
For $65 more, the Backyard Builder Bundle, 6 handbooks + the Backyard Project Planner: $99, $16.50 per handbook, instead of $189 one by one.
Verified · reviewed by industry professionals · 24 official sources, each dated · November 2026 edition
What you get
- A 23-page PDFNovember 2026 edition, 12 chapters and a workbook, printable on letter paper.
- 4 checklists and 5 worksheetsFill them in as you go: they become your project file.
- 4 drawings made for the handbookDimensioned the way a plan reviewer expects to read them.
- 24 official sources, datedEvery rule and number points to its source: statutes, code tables, city handouts and fee schedules.
Contents
- How to use this handbookp. 3
- 1. Does a detached garage need a permit?p. 3
- 2. Size, height and how many: 14 published rulesp. 4
- 3. Where it can go on the lotp. 6
- 4. Maryland, county by countyp. 9
- 5. The foundation: slab, thickened edge or frost footingp. 10
- 6. Walls, headers, bracing, trusses and snowp. 12
- 7. The floor, the door and the drainagep. 13
- 8. Electricity: one supply, one disconnect, one receptacle per bayp. 14
- 9. What goes in the applicationp. 16
- 10. Inspectionsp. 17
- 11. Feesp. 19
- 12. The worked example, in numbersp. 19
- Where this handbook stopsp. 20
- Workbookp. 20
Look inside
Real pages of the handbook, as you will print them.



Made for you if
- You are planning a one- or two-car detached garage, or a garage workshop, and want to know what size and height your lot allows before you buy a kit or trusses
- Your city asks for a site plan, a floor plan, a section and an elevation and you want to draw them yourself
- You want to know whether your garage can sit on a slab without frost footings, and what the wiring from the house must include
The projects it covers, in pictures






Illustrative photos, published by their authors under free licenses. They are not our clients' projects.
Common questions
How big can a detached garage be without a permit?
Under the model code, 200 square feet: the International Residential Code exempts one-story detached accessory structures only up to that floor area, and a one-car garage is larger. Some cities go lower: Rolling Meadows, Illinois, requires a permit above 64 square feet or 12 feet in height, and Layton, Utah, for every accessory structure.
What is the maximum size of a detached garage?
Your zoning decides, and the caps take three shapes: a fixed number (1,010 square feet in Ankeny, Iowa), a share of the lot (the lesser of 1,200 square feet and 8% of the lot in Sycamore, Illinois) or a share of the house (half of the house footprint or 600 square feet in Frederick County, Maryland). The handbook compares 14 cities and counties and computes them for a sample lot.
Does a detached garage need a frost footing?
Not always. The International Residential Code, Section R403.1.4.1, waives frost protection for free-standing accessory structures of light-frame construction up to 600 square feet with an eave height of 10 feet or less. Several Minnesota cities allow a thickened-edge slab up to 1,000 square feet; Carroll County, Maryland, still takes a monolithic edge 30 inches deep.
Do I need a permit for a detached garage in Maryland?
Yes, from your county, or your town if the lot is in one. Frederick County exempts only accessory structures under 150 square feet and charges $327 in county fees for a garage; Montgomery County lists garages among the projects that likely need a permit; Carroll County requires a building permit, plus electrical and plumbing permits if you wire or plumb it.
How do I get the PDF?
Right after payment you land on your download page. Bookmark it: it always holds the latest edition. If you lose it, write to us from the e-mail you paid with.
Full refund within 14 days, no reason needed. Refund policy
Secure payment by Stripe · instant download · invoice by e-mail
Rather hand over the whole file?
The handbook shows you how to do it yourself. If you prefer, YesPermit prepares the permit file for your address: your city's rule, the site plan, the drawings, the form and the fee. See the permit files.