
YesPermit handbook · PDF · 22 pages
Notice of Violation and Stop-Work Order Response Kit
A stop-work order is posted on the frame, or a notice of violation arrives by certified mail, about a shed, a deck, an addition or a wall taken out without a permit. Two clocks start at once: the date to fix it and the window to contest it, as short as two business days for a stop-work order review in Seattle. After that, fines can run by the day: up to $250 a day under Florida's standard ceiling and $1,000 in a county such as Palm Beach, up to $500 a day in Seattle, $6,000 for working against a stop-work order in New York City. This kit reads the paper with you line by line, sets side by side the deadlines of seven cities and counties and three state laws and the fines of 13 cities and counties and four state laws, explains how a stop-work order is lifted, how to ask for time, a review or a reduction, how the hearing runs, what changes for the permit when a case is open, and how to get the case closed and the lien released. With four letter templates, a deadline calendar, a log of every exchange with the city and a worked example in Seattle.
$29 one payment
Full refund within 14 days, no reason needed. Refund policy
Secure payment by Stripe · instant download · invoice by e-mail
Verified · reviewed by industry professionals · 36 official sources, each dated · November 2026 edition
What you get
- A 22-page PDFNovember 2026 edition, 13 chapters and a workbook, printable on letter paper.
- 2 checklists and 5 worksheetsFill them in as you go: they become your project file.
- 3 drawings made for the handbookAn annotated sample notice, the path of a case from complaint to lien, and the deadline calendar of the worked example.
- 4 letter templatesReady to adapt and send.
- 36 official sources, datedEvery rule and number points to its source: statutes, code tables, city handouts and fee schedules.
Contents
- How to use this kitp. 3
- 1. What you receivedp. 3
- 2. Reading the notice line by linep. 5
- 3. The first 48 hoursp. 7
- 4. The deadlines that start when the paper is servedp. 8
- 5. What the fines arep. 9
- 6. Stop-work orders and how they are liftedp. 12
- 7. Time, review and reductionsp. 12
- 8. The hearingp. 13
- 9. The permit under an open casep. 14
- 10. Closing the filep. 15
- 11. Liens, and what happens if you do nothingp. 15
- 12. The worked example: a backyard studio in Seattlep. 16
- 13. The four letter templatesp. 17
- Where this kit stopsp. 18
- Workbookp. 19
Look inside
Real pages of the handbook, as you will print them.



Made for you if
- A notice of violation, an order to comply, a citation or a notice of hearing came about a shed, a deck, an addition, a removed wall or other work done without its permit
- A stop-work order is posted on your project and you want to know what you may still do, how to contest it and how it is lifted
- You want the deadlines, the fines and the appeal rules of your state or city side by side, and letters to answer the office in writing
The projects it covers, in pictures



Illustrative photos, published by their authors under free licenses. They are not our clients' projects.
Common questions
What happens if you build a shed without a permit?
If the city finds it, you can receive a stop-work order and a notice of violation with a date to get the permit and pass inspection, or to remove the shed. Missing that date opens the door to citations, a hearing, daily fines and a lien: up to $500 a day in Seattle, $200 then $500 per zoning offense in Fairfax County, a $500 citation in Montgomery County. Chapter 1 maps the path of a case.
What is the fine for building without a permit?
It depends on where you are. New York City charges, for a one- or two-family house, the greater of six times the permit fee (at most $10,000) or $600; Harford County, Maryland, $500, then $750, then $1,000; Chicago a stop-work order penalty of $1,000 or more and, in most cases, a tripled permit fee. Chapter 5 sets four state laws and 13 cities and counties side by side.
How long do I have to respond to a notice of violation?
Read your notice: the window to contest it can be short. Seattle gives 10 days to ask for a review of a notice and 2 business days for a stop-work order, San Diego 10 calendar days to appeal a citation, Austin 20 days, Fairfax County 30 days for a zoning notice. Chapter 4 lists the deadlines and how each one is counted.
How do I get a stop-work order lifted?
Usually by getting the permit, passing the inspection the office asks for and paying any penalty. New York City requires a reinspection and payment of its penalties before it rescinds the order; Chicago, the permit and a $1,000+ penalty; in Santa Clarita, the inspector lifts it at a site visit once the permit is issued. Chapter 6 covers each step and how to ask for protective work meanwhile.
Can a fine for a code violation be reduced?
Several rules provide for it. A Florida enforcement board may reduce a fine it imposed; California cities must offer a hardship waiver for second and later infraction fines; New York City reduces work-without-permit penalties for partial work with an engineer's or architect's affidavit, and can waive them for a buyer when a previous owner did the work. Chapter 7 explains how to ask.
How do I get the PDF?
Right after payment you land on your download page. Bookmark it: it always holds the latest edition. If you lose it, write to us from the e-mail you paid with.
Full refund within 14 days, no reason needed. Refund policy
Secure payment by Stripe · instant download · invoice by e-mail
Rather hand over the whole file?
The handbook shows you how to do it yourself. If you prefer, YesPermit prepares the permit file for your address: your city's rule, the site plan, the drawings, the form and the fee. See the permit files.