
YesPermit handbook · PDF · 24 pages
Demolition & Wall Removal Permit Guide
Before a city lets you tear down a house, a garage or part of one, it can ask for the gas, power, water and sewer cut and proven, an asbestos survey, sometimes a historic clearance, rat baiting or letters to the neighbors; before you take out a load-bearing wall, it wants to know what holds the floor up. This guide gives the demolition document lists of nine cities, and written rules from 15 places in all, the federal asbestos rule (EPA NESHAP) and the stricter rules of three state and regional agencies, the EPA lead rule for homes built before 1978, the code's beam tables and where they stop, the published waiting periods and penalties, a pre-filing checklist, three letter templates, and a sample site plan, before and after floor plan and beam elevation.
$29 one payment
Full refund within 14 days, no reason needed. Refund policy
Secure payment by Stripe · instant download · invoice by e-mail
For $70 more, the Interior Remodel Permit Bundle, 5 handbooks + the Remodel Permit Planner: $99, $19.80 per handbook, instead of $145 one by one.
Verified · reviewed by industry professionals · 32 official sources, each dated · November 2026 edition
What you get
- A 24-page PDFNovember 2026 edition, 13 chapters and a workbook, printable on letter paper.
- 4 checklists and 6 worksheetsFill them in as you go: they become your project file.
- 3 drawings made for the handbookDimensioned the way a plan reviewer expects to read them.
- 3 letter templatesReady to adapt and send.
- 32 official sources, datedEvery rule and number points to its source: statutes, code tables, city handouts and fee schedules.
Contents
- How to use this handbookp. 3
- 1. Which work needs a permitp. 3
- 2. What nine cities ask forp. 5
- 3. Utilities: cut, capped and provenp. 6
- 4. Asbestos: the federal rule and the stricter onesp. 8
- 5. Lead paint in homes built before 1978p. 10
- 6. Historic review and demolition delaysp. 10
- 7. Neighbors, rats, the street and the dustp. 11
- 8. Removing a load-bearing wallp. 12
- 9. Widening a door or window openingp. 15
- 10. Fees and the timelinep. 15
- 11. What happens if you do it without a permitp. 16
- 12. The file: checklist, drawings and lettersp. 18
- 13. The worked example, in numbersp. 19
- Where this handbook stopsp. 20
- Workbookp. 21
Look inside
Real pages of the handbook, as you will print them.



Made for you if
- You plan to tear down a house, a detached garage or a shed and want the full list of documents and waiting periods before you book the demolition contractor
- You want to open up a kitchen or a living room by taking out a wall and need to know when it counts as load-bearing, what the city wants on paper and when an engineer comes in
- Your house was built before 1978, or before 2004 in Oregon, and you need to know which asbestos and lead rules apply to the job
The projects it covers, in pictures



Illustrative photos, published by their authors under free licenses. They are not our clients' projects.
Common questions
Do you need a permit to demolish a house or a garage?
Yes for a whole house in each of the five cities in the guide's chapter 1 table. The International Residential Code lists demolishing a building among the work that needs a permit, and Abilene, Kansas, requires one for any structure. Some cities exempt small sheds: Chicago, for a structure that would need no permit to build, such as a 100 sq ft shed, and Seattle, for a roof area of 120 sq ft or less.
Do you need a permit to remove a load-bearing wall?
Yes, in cities that use the International Residential Code: cutting away a wall or removing a load-bearing support is never an ordinary repair. Cities ask how you determined the wall is bearing and for structural details or calculations. Seattle lets beams up to 8 or 14 ft, depending on the stories above, go in without an engineer's stamp.
Do I need an asbestos survey before demolition?
Often. EPA reads the federal rule as not covering an isolated house of four units or fewer, but Oregon requires an accredited survey for homes built before 2004, the Puget Sound agency requires a notice for any structure with a roof area over 120 sq ft and South Coast requires a survey and a notice for all demolitions, even when no asbestos is found. Cities such as Abilene and Portland ask for it too.
What happens if you demolish or remove a wall without a permit?
You may owe a fee on top of the permit fee and face a stop work order. New York City charges $600 for unpermitted work on a one- or two-family home even after it is removed; Jerusalem, New York, $250 or double the permit fee; and in Boston a significant building torn down in violation of Article 85 blocks new construction for two years.
How do I get the PDF?
Right after payment you land on your download page. Bookmark it: it always holds the latest edition. If you lose it, write to us from the e-mail you paid with.
Full refund within 14 days, no reason needed. Refund policy
Secure payment by Stripe · instant download · invoice by e-mail
Rather hand over the whole file?
The handbook shows you how to do it yourself. If you prefer, YesPermit prepares the permit file for your address: your city's rule, the site plan, the drawings, the form and the fee. See the permit files.