
YesPermit handbook · PDF · 15 pages
Bathroom and Kitchen Remodel Permit Handbook: what needs a permit, and what the inspector checks
A remodel is not one job: retiling, moving a toilet, adding an outlet, swapping a tub for a shower and removing a wall each sit on their own side of the permit line. This handbook splits your project into its parts, item by item, with the IRC exemption list and the published rules of seven cities, then walks through what the plans show and what inspectors check in a bathroom and a kitchen, with sample plans, real fees and the inspection checklists.
$29 one payment
Full refund within 14 days, no reason needed. Refund policy
Secure payment by Stripe · instant download · invoice by e-mail
For $120 more, all 11 handbooks: $149, $13.55 per handbook, instead of $339 one by one.
For $70 more, the Interior Remodel Permit Bundle, 5 handbooks + the Remodel Permit Planner: $99, $19.80 per handbook, instead of $145 one by one.
Verified · reviewed by industry professionals · 15 official sources, each dated · October 2026 edition
What you get
- A 15-page PDFOctober 2026 edition, 14 chapters and a workbook, printable on letter paper.
- 4 checklists and 4 worksheetsFill them in as you go: they become your project file.
- 2 drawings made for the handbookDimensioned the way a plan reviewer expects to read them.
- 15 official sources, datedEvery rule and number points to its source: statutes, code tables, city handouts and fee schedules.
Contents
- How to use this handbookp. 3
- 1. What the model code exemptsp. 3
- 2. Seven cities, item by itemp. 4
- 3. Plans or no plansp. 5
- 4. Bathroom fixtures and spacingp. 6
- 5. The shower and the tubp. 7
- 6. Safety glass and ventilationp. 8
- 7. Bathroom electrical and lightingp. 8
- 8. Kitchen electricalp. 9
- 9. Kitchen plumbing, gas and the hoodp. 10
- 10. Walls, windows and structurep. 10
- 11. What a permit brings with itp. 10
- 12. Inspectionsp. 11
- 13. Feesp. 12
- 14. Work already done without a permitp. 12
- Where this handbook stopsp. 12
- Workbookp. 13
Look inside
Real pages of the handbook, as you will print them.



Made for you if
- You are planning a bathroom or kitchen remodel and want to know which parts need a permit
- You want to know what the plans must show and what the inspector will check before you hire trades
- You are doing part of the work yourself and want the code lines in one place
Common questions
Do I need a permit to remodel my bathroom?
Finish work such as tile, paint, countertops and cabinets is exempt under the IRC. Moving or adding fixtures, pipes, outlets, circuits, fans or walls needs a permit almost everywhere, and some cities, like Hayward and Pleasanton in California, require one for every bathroom remodel. The handbook splits the work item by item.
Do I need a permit to remodel my kitchen?
For new layouts, relocated plumbing or gas, added circuits, new windows or removed walls, yes. Pleasanton, California, requires a permit for all remodeled kitchens but processes like-for-like remodels with an application only; Miami-Dade exempts cabinet replacement in the same configuration.
How far apart do kitchen outlets have to be?
Pleasanton and Palatine publish the same rule: no point along the countertop wall line more than 24 inches from a receptacle, so no more than 48 inches between two, on at least two 20 amp GFCI protected small-appliance circuits.
How do I get the PDF?
Right after payment you land on your download page. Bookmark it: it always holds the latest edition. If you lose it, write to us from the e-mail you paid with.
Full refund within 14 days, no reason needed. Refund policy
Secure payment by Stripe · instant download · invoice by e-mail
Rather hand over the whole file?
The handbook shows you how to do it yourself. If you prefer, YesPermit prepares the permit file for your address: your city's rule, the site plan, the drawings, the form and the fee. See the permit files.