YesPermit

Bathroom remodel checklist: permit, code items and inspections

Before a bathroom remodel, sort the work: tile, paint, countertops and cabinets are finish work the model code exempts, while moving or adding fixtures, pipes, outlets, circuits, a fan or a wall needs a permit almost everywhere. Then check the items inspectors look at: fixture clearances, shower size and pan, safety glass, exhaust fan, a GFCI-protected 20 amp circuit and alarms.

Updated

Editorial lead: The YesPermit team

Rather not do this yourself? We prepare your permit file for your address, and revise it until approved.

Get my permit · $499

Key facts

A remodeled bathroom with green wall tile

1. Which work needs a permit?

The model code's exemption list (IRC Section R105.2) covers "painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work"; on the trades side, it exempts only minor repairs, such as stopping leaks or reinstalling a toilet without replacing or rearranging valves, pipes or fixtures[1]. Federal Way adds: "Unless otherwise exempted, separate permits may be required"[1].

Cities draw the line in different places:

  • Laguna Hills, California: a permit for remodels that remove, replace or relocate showers, tubs or sinks, or alter the electrical or exhaust fan; no permit for a countertop replacement or cabinet re-facing[3].
  • Hayward, California: a permit for all types of bathroom remodels, from replacing a tub or shower enclosure to a complete reconfiguration, with drawings[4].
  • Pleasanton, California: a permit for all new, relocated or remodeled bathrooms, including repairing or replacing damaged shower framing; like-for-like remodels with no layout change go through with an application only[5].
  • Sacramento, California: a minor bathroom remodel permit without plans when the work is limited to in-kind fixtures and finishes; a full plan review when openings in the perimeter walls are created or moved[6].

Permit or not: your scope

  • Finishes only: paint, tile, flooring, countertop, cabinet doors
  • Fixtures replaced in the same place: toilet, sink, tub, shower valve
  • Fixtures moved or added
  • New outlets, circuits, lights or fan
  • Tub replaced by a shower, or a curbless shower
  • Walls moved or removed; windows or doors added or enlarged

2. The plan

When plans are required, Pleasanton asks for an existing floor plan with every fixture, wall (load-bearing or not), door and window, and a proposed plan with the new layout[5]. Hayward accepts a basic drawing: the modified features if the layout stays, an existing and a proposed drawing if it changes[4]. Removing a load-bearing wall brings structural calculations by a qualified design professional[5].

3. Clearances and fixtures

Toilet, sink and shower

  • Toilet center 15 in from a side wall or obstruction; 30 in center to center from another toilet or bidet (Pleasanton, Hayward)
  • 24 in of clear space in front of the toilet and the vanity (Pleasanton)
  • Shower at least 1,024 sq in inside, able to contain a 30 in circle; 30 x 60 in accepted where it replaces a tub (Pleasanton, Hayward, Sacramento)
  • Shower door at least 22 in clear, swinging out
  • Shower pan or site-built liner 3 in up the walls, sloped 1/4 to 1/2 in per foot to the drain; curb 2 to 9 in above the drain
  • Walls of the shower and above a tub with a showerhead: nonabsorbent finish 6 ft above the floor
  • Shower valve pressure-balancing or thermostatic, 120 °F maximum
  • 2 in shower drain

Sources: Pleasanton[5], Hayward[4], Sacramento[6], Laguna Hills[3] and IRC R307.2[2]. Outside California, plumbing codes differ: Castle Pines, Colorado, asks for at least 21 inches in front of the toilet, 15 inches from its center to a side wall and a shower of at least 900 square inches[7].

4. Glass, fan and light

Safety and ventilation

  • Window glass within 60 in of the tub or shower and less than 60 in above the floor: tempered, with a permanent label (IRC R308.4.5, Pleasanton)
  • Either 3 sq ft of window, half openable, or an exhaust fan to the outdoors (IRC R303.3)
  • Fan of 50 cfm intermittent or 20 cfm continuous, backdraft damper, humidity control (California handouts)
  • Fan exhaust 3 ft from property lines and openings, 10 ft from a forced-air inlet (Sacramento, Hayward)

Sources: IRC[2], Pleasanton[5], Hayward[4], Sacramento[6], Laguna Hills[3].

5. Electrical

Circuit, outlets and lights

  • At least one 20 A circuit for the bathroom receptacles, serving no other outlets (Laguna Hills, Sacramento)
  • All bathroom receptacles GFCI protected; new ones tamper-resistant
  • A receptacle within 3 ft of the outside edge of each basin, never more than 12 in below the counter
  • No receptacle inside the tub or shower space
  • No pendant, track light or ceiling fan within 3 ft horizontally and 8 ft vertically of the tub rim or shower threshold
  • Fixtures over the tub or shower rated for damp or wet locations

Sources: Laguna Hills[3], Sacramento[6], Pleasanton[5], Hayward[4].

6. What the permit brings with it

Under the IRC, alterations that need a permit bring the house's smoke alarms up to the rules for new dwellings (R314.2.2)[2]. Pleasanton wants smoke and carbon monoxide alarms installed before the final inspection[5]; Hayward when the work is worth more than $1,000[4]. In California, a remodel permit also requires replacing non-compliant plumbing fixtures throughout the house with water-saving ones: toilets 1.28 gallons per flush, bathroom faucets 1.2 gpm, showerheads 1.8 gpm (Pleasanton)[5].

A modern bathroom with a white basin, a chrome faucet and dark square wall tiles
A modern bathroom with a white basin, a chrome faucet and dark square wall tiles. Illustrative photo.

7. Inspections

What the inspector checks

  • Rough: framing as approved, window locations for safety glass, new pipes under pressure test, shower pan under a 24-hour water test, fan duct to the exterior (Pleasanton)
  • Final: fixtures sealed, tempered glass labelled, GFCI working, fan vented, alarms in place

Source: Pleasanton[5].

  • Permit Kit$349
  • Kit + Review$399
  • All-in$499

Your permit file, prepared for your address

We handle the permit. You build your project.

  • Your city's rule, for your addressThe code section, its link and the date we checked it.
  • Site plan and dimensioned drawingsDistances to your property lines, ready for the application.
  • The form, where to file it, and the published feePlus the documents list and an HOA request template.
  • Reviewed, then revised until approvedWith All-in, after every comment from the city, for up to 6 months.
Approved or your money backFull refund if the city refuses your permit for a written requirement we should have caught. Read the conditions

Common questions

Do I need a permit to retile a bathroom?

Not under the model code, which exempts painting, papering, tiling, carpeting, cabinets, countertops and similar finish work. Some cities still require a permit for every bathroom remodel, and replacing a shower pan or the backing behind the tile usually brings one. Ask your city.

How much space does a toilet need?

California cities such as Pleasanton and Hayward require at least 15 inches from the toilet's center to a side wall or obstruction, 30 inches center to center from another toilet or bidet, and 24 inches of clear space in front. Castle Pines, Colorado, asks for 21 inches in front and 15 inches to the side.

What is the minimum shower size?

California handouts require at least 1,024 square inches of finished interior, able to contain a 30 inch circle, with a door at least 22 inches wide that swings out; a 30 by 60 inch receptor that replaces a bathtub is accepted. Castle Pines, Colorado, asks for 900 square inches.

Does a bathroom need an exhaust fan?

Under IRC R303.3, a bathroom needs either 3 square feet of window, half of it openable, or artificial light and an exhaust fan vented directly outdoors. California cities require a fan of at least 50 cfm intermittent or 20 cfm continuous, with humidity control.

  • Permit Kit$349
  • Kit + Review$399
  • All-in$499

Your permit file, prepared for your address

We handle the permit. You build your project.

  • Your city's rule, for your addressThe code section, its link and the date we checked it.
  • Site plan and dimensioned drawingsDistances to your property lines, ready for the application.
  • The form, where to file it, and the published feePlus the documents list and an HOA request template.
  • Reviewed, then revised until approvedWith All-in, after every comment from the city, for up to 6 months.
Approved or your money backFull refund if the city refuses your permit for a written requirement we should have caught. Read the conditions
Rather hire a contractor to build it?Tell us about the job: we pass your request to partner contractors in your area. No cost to ask, no obligation to hire.
What do you need?
When would you like the work done?

Sources

  1. City of Federal Way, Washington, Residential permit exemptions (International Residential Code, Section R105.2). Checked October 31, 2026.
  2. International Code Council, 2021 International Residential Code, Chapter 3 Building Planning (Sections R303.3, R307, R308.4.5, R314.2.2). Checked October 31, 2026.
  3. City of Laguna Hills, California, Building Division, Residential Bathroom Remodels (revised 02/2023). Checked October 31, 2026.
  4. City of Hayward, California, Development Services, Residential Bathroom Remodels (revised 4-12-17). Checked October 31, 2026.
  5. City of Pleasanton, California, Building and Safety, Residential Bathroom Alteration Requirements (JLA 01.26). Checked October 31, 2026.
  6. City of Sacramento, California, Bathroom Remodels handout CDD-0418 (last revised 01-01-2026). Checked October 31, 2026.
  7. City of Castle Pines, Colorado, Residential Basement Finish, Building Guide for Homeowners (bathroom clearances). Checked October 31, 2026.
$499Approved or refunded
Get my permit · $499