YesPermit
Cover of Shed Permit Exemption Handbook, a YesPermit handbook

YesPermit handbook · PDF · 23 pages

Shed Permit Exemption Handbook

A 10 x 12 ft shed needs no building permit in New York City, Los Angeles County or Indianapolis, and needs one in Seattle, Washington, DC, and Montgomery County, Maryland. A 16 x 16 ft shed needs none in Fairfax or Prince William County, Virginia. The line is 120, 200 or 256 square feet depending on where you live, and the words next to it decide as much as the number: one story, a height limit, the roof measured with its eaves, no permanent foundation, no power, the rear yard only, one shed per lot. This handbook reads those rules in the texts of 25 cities and counties, explains what counts as the size, when skids or a slab change the answer, the setbacks and the fire rule near a property line, what happens when a shed goes up without a permit, and what a shed permit costs, with three worked examples, a decision tree and two letter templates.

$29 one payment

Get the handbook · $29

Full refund within 14 days, no reason needed. Refund policy

Secure payment by Stripe · instant download · invoice by e-mail

For $70 more, the Backyard Builder Bundle, 6 handbooks + the Backyard Project Planner: $99, $16.50 per handbook, instead of $189 one by one.

Verified · reviewed by industry professionals · 44 official sources, each dated · November 2026 edition

What you get

Contents

Look inside

Real pages of the handbook, as you will print them.

Page 1 of Shed Permit Exemption Handbook
Page 1
Page 2 of Shed Permit Exemption Handbook
Page 2
Page 4 of Shed Permit Exemption Handbook
Page 4

Made for you if

  • You are about to buy or build a storage shed and want to know, from your own city's or county's text, the largest size and height you may put up without a building permit
  • You are choosing between skids, blocks and a slab, or between a delivered shed and one built on site, and want to know which choice changes the permit
  • Your shed is already up without a permit, or the house you are buying has one, and you want the published penalties and the way to legalize it

Common questions

Do I need a permit for a shed under 200 square feet?

Under the model 2024 IRC, no building permit for a one-story detached accessory structure of 200 square feet or less, and Phoenix, Austin, Denver, Portland, Las Vegas, Federal Way and Howard County use that line. But Seattle stops below 120 square feet, New York City at 120 and 7 ft 6 in high, Washington, DC, at 50, and Montgomery County, Maryland, requires a permit for every shed. Chapter 2 sets 25 places side by side.

Do you need a permit for a 10x12 shed?

A 10 x 12 ft shed has 120 square feet of floor. It is within the line where the rule says 120 or less (New York City, Los Angeles County, Indianapolis, Elkhart) and every 200 or 256 line, other conditions met. It needs a permit in Seattle (less than 120), in San Diego if its roof with the eaves exceeds 120 square feet, in Washington, DC, and in Montgomery County. Chapters 2 and 3.

Does a shed on skids need a permit?

Sometimes the base decides. Carroll County, Maryland, exempts a prefab shed under 150 square feet only if it is on skids and movable; Indianapolis exempts only a structure not on a permanent foundation; Seattle only a slab on the ground. Howard County gives the same size answer for a shed on skids. Chapter 4.

What happens if you don't get a permit for a shed?

Published consequences include a $600 civil penalty for work without a permit on a one- or two-family house in New York City, a stop work order penalty of $1,000 or more and a tripled permit fee in Chicago, an investigation fee of $250 or more in Phoenix, and, under state law, civil penalties of up to $4,000 in Virginia and, in Florida, fines of up to $250 a day for a first violation ($1,000 where a county or city of 50,000 people or more adopts it). The order to get the permit or remove the shed comes with them. Chapter 8.

How much does a shed permit cost?

From nothing to several hundred dollars. For a 10 x 12 ft shed: $0 for the building permit in the Virginia counties under 256 square feet, $20 in Harford County, $50 in Canandaigua, $165 for Loudoun's zoning permit, $466.39 in Montgomery County. Chapter 9 works out three shed sizes line by line.

How do I get the PDF?

Right after payment you land on your download page. Bookmark it: it always holds the latest edition. If you lose it, write to us from the e-mail you paid with.

Get the handbook · $29

Full refund within 14 days, no reason needed. Refund policy

Secure payment by Stripe · instant download · invoice by e-mail

Rather hand over the whole file?

The handbook shows you how to do it yourself. If you prefer, YesPermit prepares the permit file for your address: your city's rule, the site plan, the drawings, the form and the fee. See the permit files.

Free articles on the same subject

Other handbooks

$2923 pages · instant PDF
Get it now