Why deck permits get rejected

Deck permits are usually refused or sent back for a short list of reasons: the deck sits in a setback or an easement, the site plan lacks the distances the city needs, the ledger attachment or the footings do not match the code details, or the deck carries a load such as a hot tub that needs an engineer. Most are fixable on resubmission.

Updated

Rather not do this yourself? We prepare your deck permit file for your address, and revise it until approved.

Get my permit · $399

Key facts

Close-up of grey deck boards with a few fallen autumn leaves

Refused, or sent back?

Most deck applications are not refused outright. They come back with correction comments: something is missing, unclear or outside the rules, and the review stops until you answer. A real refusal happens when the deck itself cannot be approved where and how it is drawn, for example because it sits in an easement. Both cost time. The reasons below come from what building departments publish about decks, so you can check your file against them before you submit.

Where the deck sits: setbacks and easements

This is the first thing a reviewer measures. Setbacks are the minimum distances between a structure and the property lines; easements are strips of your lot that a utility or the city can use.

  • Setbacks change with height. In Thornton, Colorado, decks between 30 inches and 8 feet high may reach to 10 feet from the rear property line, but decks over 8 feet tall must meet the full required rear setback, which the city says prevents decks from looming over a neighbor's property[1]. Enclosed decks must meet the full building setbacks[1].
  • Easements are off limits. Thornton allows the setback encroachment only as long as the deck does not encroach into any easement[1]. Hanover, Minnesota, says decks go outside drainage and utility easements and outside building and septic setbacks[2].
  • Front yards have extra rules. Thornton requires decks in the front yard to be compatible in materials and colors with the home, and decks larger than 480 square feet in the front yard need a separate Minor Development Permit[1].

A deck that crosses one of these lines is drawn in the wrong place, and no correction letter fixes that. Moving or reshaping it does, or a variance.

What the site plan is missing

The site plan is how the city checks the paragraph above, so a vague one gets sent back. Hastings, Minnesota, asks for a scaled drawing that accurately shows the deck with its distances from property lines, utility easements, power lines and other structures[4]. Hanover asks for the proposed structure and existing buildings, the distances to property lines, easements and setbacks, and the location of the well, septic system and driveways, on a survey or site plan[2].

Hanover also lists the cases in which it may not require a certificate of survey, such as when the city already has a foundation as-built survey of the home, or when the deck would be at least 5 feet from any rear setback line, wetland buffer or drainage and utility easement[2]. Outside its list, plan on a survey.

Structural details that do not match the code

When a city publishes prescriptive deck details, the reviewer compares your drawings to them line by line. The City of Alexandria, Virginia, says construction cannot deviate from its details unless prior approval is obtained[3]. Common mismatches:

Problem in the drawingsWhat the Alexandria details say
Ledger bolted through brick or stone veneerProhibited; a freestanding deck or engineering is required[3]
Ledger fastened to a chimney, bay window overhang or open-web floor trussesProhibited, same remedy[3]
Two-level deck drawn from the single-level detailsUsing the details for multi-level decks is prohibited[3]
Privacy screen, planters, built-in seating or hot tubNot approved under the details[3]
Footing near the house drawn shallowWithin 5 feet of the house wall, it must bear at the house footing elevation[3]
Guards on 2x6 joistsGuards cannot be attached to decks framed with 2x6 joists[3]

Guards are another frequent comment. Hastings requires a guard at least 36 inches high on every deck 30 inches or more above grade, built so a 4-inch sphere cannot pass through and able to withstand a 200-pound lateral force[4].

Rules the city does not enforce, but someone else does

A building permit does not settle your homeowners association. Milpitas, California, states that on a property regulated by an association, any exterior work must have the association's approval, and that getting it is the owner's responsibility[9]. An HOA refusal will not appear in the city's review, but it can still stop the project.

When the answer is a variance

If the deck cannot fit the setback, the alternative to redesigning is a variance: a request for permission to depart from the zoning rule. It is a separate application with its own fee. Canandaigua, New York, lists $100 for an area variance in its 2026 fee schedule[5]. A variance is decided case by case, so it is not a formality to plan around.

Building it anyway

Some owners decide to build first and ask later. Cities have answers for that:

  • Stop-work orders and extra fees. Carmel-by-the-Sea, California, issues a stop-work order for work begun without a required permit, and charges a stop-work investigation fee in addition to double permit fees before it will issue the permit[6].
  • Penalties to legalize, or to remove. In New York City, legalizing work done without a permit on a one- or two-family home carries a $600 penalty, and removing the work instead carries the same penalty[7].
  • It follows the house. Fairfax County, Virginia, applies its rules on unpermitted construction to properties that have been bought and sold, regardless of when the construction was done[8].

How to avoid the corrections

Build the file the way the reviewer reads it: a site plan with every distance and easement, a framing plan inside the prescriptive tables, the ledger and footing details your city publishes, the guard and stair details, and a note on anything outside them. Then answer every comment in one resubmission. That is the job the All-in offer does: our permit team prepares the file for your city's rules, reviews it before you file, and handles the city's comments until the permit is issued.

Common questions

What is the most common reason a deck permit is sent back?

No public statistic ranks the reasons. What city handouts show is where reviewers look first, the site plan with the distances to property lines, easements and setbacks, and the structural details of footings, ledger and guards.

Can a deck be built in a utility easement?

Often not. Thornton, Colorado, lets decks encroach into the rear setback only if they stay out of easements, and Hanover, Minnesota, says decks go outside drainage and utility easements. Check the easements on your survey or plat before you design.

My deck was refused because of the setback. What now?

Change the design to fit, or ask for a variance. A variance is a separate request with its own fee, Canandaigua, New York, charges $100 for an area variance in 2026, and approval is not automatic.

What happens if I build the deck anyway?

Cities can stop the work and charge more. Carmel-by-the-Sea, California, issues a stop-work order and charges a stop-work investigation fee plus double permit fees for work begun before the permit is issued.

We handle the permit. You build your deck.

  • Your city's rule, for your addressThe code section, its link and the date we checked it.
  • Site plan and dimensioned drawingsDistances to your property lines, ready for the application.
  • The form, where to file it, and the published feePlus the documents list and an HOA request template.
  • Reviewed, then revised until approvedWith All-in, after every comment from the city, for up to 6 months.
Approved or your money backFull refund if the city refuses your permit for a written requirement we should have caught. Read the conditions

Sources

  1. City of Thornton, Colorado, What are the city's requirements for decks, porches, and patios?. Checked October 13, 2026.
  2. City of Hanover, Minnesota, Deck Additions handout (revised 4/28/2026). Checked October 13, 2026.
  3. City of Alexandria, Virginia, Typical Deck Details, based on the 2021 Virginia Residential Code (version 2024-07-01). Checked October 13, 2026.
  4. City of Hastings, Minnesota, Deck permit requirements. Checked October 13, 2026.
  5. City of Canandaigua, New York, Fee Schedule 2026. Checked October 13, 2026.
  6. City of Carmel-by-the-Sea, California, Stop Work Orders and Emergency Permits. Checked October 13, 2026.
  7. New York City Department of Buildings, Form L2 instructions, civil penalties for work without a permit (rev. 03/2026). Checked October 13, 2026.
  8. Fairfax County, Virginia, Department of Code Compliance, Unpermitted Construction (September 2024). Checked October 13, 2026.