---
title: "Shed Permit Exemption Handbook: 25 Cities' Size Limits (PDF)"
description: "PDF handbook on shed permits: the no-permit size line of 25 cities and counties, skids vs. slabs, setbacks, fines for unpermitted sheds and fees."
url: https://yespermit.com/handbooks/shed-permit-exemption-handbook/
updated: 2026-11-14
language: en-US
---

YesPermit handbook · PDF · 23 pages

# Shed Permit Exemption Handbook

A 10 x 12 ft shed needs no building permit in New York City, Los Angeles County or Indianapolis, and needs one in Seattle, Washington, DC, and Montgomery County, Maryland. A 16 x 16 ft shed needs none in Fairfax or Prince William County, Virginia. The line is 120, 200 or 256 square feet depending on where you live, and the words next to it decide as much as the number: one story, a height limit, the roof measured with its eaves, no permanent foundation, no power, the rear yard only, one shed per lot. This handbook reads those rules in the texts of 25 cities and counties, explains what counts as the size, when skids or a slab change the answer, the setbacks and the fire rule near a property line, what happens when a shed goes up without a permit, and what a shed permit costs, with three worked examples, a decision tree and two letter templates.

$29 one payment

[Get the handbook · $29](https://yespermit.com/paiement/?panier=shed-permit-exemption-handbook:1&lang=en)

Full refund within 14 days, no reason needed. [Refund policy](https://yespermit.com/refund-policy/)

Secure payment by Stripe · instant download · invoice by e-mail

For $70 more, [the Backyard Builder Bundle](https://yespermit.com/handbooks/backyard-builder-bundle/), 6 handbooks + the Backyard Project Planner: $99, $16.50 per handbook, instead of $189 one by one.

Verified · reviewed by industry professionals · 44 official sources, each dated · November 2026 edition

## What you get

- **A 23-page PDF**: November 2026 edition, 11 chapters and a workbook, printable on letter paper.
- **3 checklists and 2 worksheets**: Fill them in as you go: they become your project file.
- **4 drawings made for the handbook**: The no-permit line of 25 places in one chart, one 10 x 12 ft shed measured three ways, three bases in section, and the permit-or-not decision tree.
- **2 letter templates**: Ready to adapt and send.
- **44 official sources, dated**: Every rule and number points to its source: statutes, code tables, city handouts and fee schedules.

## Contents

- How to use this handbook **p. 3**
- 1. The model rule and the three lines **p. 4**
- 2. The no-permit line in 25 cities and counties **p. 4**
- 3. What counts as the size of a shed **p. 8**
- 4. Skids, blocks or a slab: when the base decides **p. 10**
- 5. Setbacks, easements and the fire rule **p. 11**
- 6. Prefab or built on site **p. 12**
- 7. Power, water, flood zones and other triggers **p. 13**
- 8. What happens if you build a shed without a permit **p. 14**
- 9. What a shed permit costs: three worked examples **p. 15**
- 10. Permit or not: the decision tree **p. 17**
- 11. The two letter templates **p. 18**
- Where this handbook stops **p. 19**
- Workbook **p. 20**

## Look inside

Real pages of the handbook, as you will print them.

Page 1

Page 2

Page 4

## Made for you if

- You are about to buy or build a storage shed and want to know, from your own city's or county's text, the largest size and height you may put up without a building permit
- You are choosing between skids, blocks and a slab, or between a delivered shed and one built on site, and want to know which choice changes the permit
- Your shed is already up without a permit, or the house you are buying has one, and you want the published penalties and the way to legalize it

## The projects it covers, in pictures

Two red-stained wooden garden sheds with windows, behind a trimmed green hedge. Photo: [Garry Knight](https://commons.wikimedia.org/wiki/File:Garden_Sheds_(4854246300).jpg), [CC BY 2.0](https://creativecommons.org/licenses/by/2.0/)

A small wooden shed with a white door standing alone in a dry golden field under a blue sky. Photo: [Matt Bango](https://stocksnap.io/photo/grassland-shed-8DQZKMECWJ), [CC0 1.0 (public domain)](https://creativecommons.org/publicdomain/zero/1.0/)

A weathered wooden shed with a blue door and a bicycle leaning on it. Photo: [Alexander Shustov](https://stocksnap.io/photo/greenbike-wood-643FE96E84), [CC0](https://creativecommons.org/publicdomain/zero/1.0/)

Illustrative photos, published by their authors under free licenses. They are not our clients' projects.

## Common questions

### Do I need a permit for a shed under 200 square feet?

Under the model 2024 IRC, no building permit for a one-story detached accessory structure of 200 square feet or less, and Phoenix, Austin, Denver, Portland, Las Vegas, Federal Way and Howard County use that line. But Seattle stops below 120 square feet, New York City at 120 and 7 ft 6 in high, Washington, DC, at 50, and Montgomery County, Maryland, requires a permit for every shed. Chapter 2 sets 25 places side by side.

### Do you need a permit for a 10x12 shed?

A 10 x 12 ft shed has 120 square feet of floor. It is within the line where the rule says 120 or less (New York City, Los Angeles County, Indianapolis, Elkhart) and every 200 or 256 line, other conditions met. It needs a permit in Seattle (less than 120), in San Diego if its roof with the eaves exceeds 120 square feet, in Washington, DC, and in Montgomery County. Chapters 2 and 3.

### Does a shed on skids need a permit?

Sometimes the base decides. Carroll County, Maryland, exempts a prefab shed under 150 square feet only if it is on skids and movable; Indianapolis exempts only a structure not on a permanent foundation; Seattle only a slab on the ground. Howard County gives the same size answer for a shed on skids. Chapter 4.

### What happens if you don't get a permit for a shed?

Published consequences include a $600 civil penalty for work without a permit on a one- or two-family house in New York City, a stop work order penalty of $1,000 or more and a tripled permit fee in Chicago, an investigation fee of $250 or more in Phoenix, and, under state law, civil penalties of up to $4,000 in Virginia and, in Florida, fines of up to $250 a day for a first violation ($1,000 where a county or city of 50,000 people or more adopts it). The order to get the permit or remove the shed comes with them. Chapter 8.

### How much does a shed permit cost?

From nothing to several hundred dollars. For a 10 x 12 ft shed: $0 for the building permit in the Virginia counties under 256 square feet, $20 in Harford County, $50 in Canandaigua, $165 for Loudoun's zoning permit, $466.39 in Montgomery County. Chapter 9 works out three shed sizes line by line.

### How do I get the PDF?

Right after payment you land on your download page. Bookmark it: it always holds the latest edition. If you lose it, write to us from the e-mail you paid with.

[Get the handbook · $29](https://yespermit.com/paiement/?panier=shed-permit-exemption-handbook:1&lang=en)

Full refund within 14 days, no reason needed. [Refund policy](https://yespermit.com/refund-policy/)

Secure payment by Stripe · instant download · invoice by e-mail

## Rather hand over the whole file?

The handbook shows you how to do it yourself. If you prefer, YesPermit prepares the permit file for your address: your city's rule, the site plan, the drawings, the form and the fee. [See the permit files](https://yespermit.com/pricing/).

## Free articles on the same subject

- [What happens if you build without a permit](https://yespermit.com/guides/what-happens-if-you-build-without-a-permit/)
- [Setbacks explained](https://yespermit.com/guides/setbacks-explained/)

## Other handbooks

- [Deck Permit Plans · $34 Draw the plan set for your deck permit yourself: site plan, framing plan, elevation and details, sized from the code tables.](https://yespermit.com/handbooks/deck-permit-plans/)
- [Garage Conversion Permit Guide · $29 Turn a garage into a legal bedroom, office or ADU: parking, setbacks, habitable-room rules, energy code, plan set, fees and inspections.](https://yespermit.com/handbooks/garage-conversion-permit-guide/)
- [Unpermitted Work Playbook · $29 Find work done without a permit, price it, legalize it with an as-built permit, remove it or disclose it, before a sale or a claim.](https://yespermit.com/handbooks/unpermitted-work-playbook/)
- [Owner-Builder Handbook · $24 Pull your own permit as an owner-builder: what you sign in your state, the four traps, licensed subs, inspections and the closing file.](https://yespermit.com/handbooks/owner-builder-handbook/)
- [Backyard Structures Permit Guide · $34 Shed, greenhouse, treehouse, gazebo or carport: the permit-free line of 20 big cities, site plan and drawing models, wiring, anchoring, inspections.](https://yespermit.com/handbooks/backyard-structures-permit-guide/)
- [Driveway, Retaining Wall and Patio Permit Plans · $34 Driveway, retaining wall or patio: the curb cut permit, the 4 ft wall line and when an engineer stamps, impervious limits, example drawings and a coverage worksheet.](https://yespermit.com/handbooks/driveway-retaining-wall-patio-permit-plans/)
- [Fence, Easement and Setback Permit Kit · $29 Fence permits and height limits in 15 named cities, fences in utility, drainage and access easements, setbacks and lot lines, with a sample site plan and elevation drawn to scale.](https://yespermit.com/handbooks/fence-easement-setback-permit-kit/)
- [Pool Permit and Barrier Handbook · $34 When an in-ground or above-ground pool needs a permit, with the rules of 12 cities and states (Wisconsin included), the 48-inch barrier and gates under the 2024 ISPSC, bonding and GFCI under NEC 680, setbacks, a sample site plan and inspection checklists.](https://yespermit.com/handbooks/pool-permit-barrier-handbook/)
- [Basement Finishing Permit Handbook · $29 Finish a basement legally: when it needs a permit, the plans, egress windows and window wells, ceiling heights, bedrooms, smoke and CO alarms, fire blocking, stairs, and the inspections.](https://yespermit.com/handbooks/basement-finishing-permit-handbook/)
- [Bathroom and Kitchen Remodel Permit Handbook · $29 Which bathroom and kitchen remodel work needs a permit, line by line, when plans are required, and what inspectors check: clearances, showers, safety glass, fans, GFCI, countertop outlets, hoods, walls.](https://yespermit.com/handbooks/bathroom-kitchen-remodel-permit-handbook/)
- [Patio Cover and Pergola Permit Plans · $34 When a patio cover or pergola needs a permit (12 cities), the IRC patio cover rules, attaching to the house without the rafter tails or veneer, posts, beams, footings, setbacks, a sample site plan and section.](https://yespermit.com/handbooks/patio-cover-pergola-permit-plans/)
- [Pole Barn and Agricultural Building Permit Plans · $34 When a pole barn or farm building needs a permit, with the rules of 14 counties and states (six in Maryland), what the agricultural exemption covers, setbacks, posts, trusses, snow and wind in two published designs, the barndominium case, a sample site plan, post plan and section, and a setback worksheet.](https://yespermit.com/handbooks/pole-barn-agricultural-building-permit-plans/)
- [Detached Garage Permit Plans · $34 How big, how tall and how close to the lines a detached garage can be in 14 cities and counties (three in Maryland), the slab, thickened edge or frost footing under IRC chapter 4, framing and trusses, floor slope, the wiring under NEC 210 and 225, a sample site plan, slab section, elevation and wiring plan, and a setback worksheet.](https://yespermit.com/handbooks/detached-garage-permit-plans/)
- [Treehouse Permit & Build Standards Handbook · $29 When a treehouse needs a permit in 17 cities, villages and counties, how tall it may be and how close to the lines, a tree near the property line, attaching to the tree with bolts and brackets, guards and stairs above 30 inches, surfacing, insurance basics, and a sample site plan, framing plan, attachment detail and elevation.](https://yespermit.com/handbooks/treehouse-permit-build-standards-handbook/)
- [Demolition & Wall Removal Permit Guide · $29 When tearing down a house, a garage or a wall needs a permit, the documents 9 cities ask for, utility disconnect letters and sewer caps, asbestos rules (EPA NESHAP and 3 state and regional agencies), the lead rule for pre-1978 homes, waiting periods, published penalties, and a sample site plan, before and after plan and beam elevation.](https://yespermit.com/handbooks/demolition-wall-removal-permit-guide/)
- [HOA Architectural Review Application Kit · $29 Getting your HOA's approval before you file with the city: checking a project such as a pergola kit against your covenants, what to put in the application, neighbor letters, what Florida, California, Texas and Arizona law says about response times, written denials and appeals, what an HOA cannot forbid, five letter templates and a sample site plan, elevation and appeal timeline.](https://yespermit.com/handbooks/hoa-architectural-review-application-kit/)
- [Zoning Variance and Setback Relief Application Kit · $29 When a setback, height or size rule blocks your shed, garage, addition or porch: redesign, minor variance, adjustment or full variance; the legal tests of five states and five local codes, the statement of justification, the site plan, neighbors and notice, published fees, the hearing, appeals and expiry, with three letter templates, a statement of justification template, an annotated site plan and a worked example.](https://yespermit.com/handbooks/zoning-variance-setback-relief-kit/)
- [Maryland Homeowner Permit Handbook · $34 Do you need a permit in your Maryland county? The published rules of Anne Arundel, Baltimore County, Howard, Prince George's, Harford, Montgomery, Frederick and Carroll for sheds, detached garages, pole barns, decks, finished basements and bathrooms: permit triggers, size caps, setbacks, plans and fees side by side, with a comparison table, three worked fee examples, a sample site plan and basement plan, and four county letter templates.](https://yespermit.com/handbooks/maryland-homeowner-permit-handbook/)
- [Building Permit Fees and Cost Handbook · $29 How much will your permit cost? How cities and counties price a permit (flat fee, square footage, value of the work, plan review, technology and state surcharges, impact fees, re-inspections, penalties), read in the dated fee schedules of 18 local governments, with five worked examples computed line by line (deck, carport, driveway and curb cut, kitchen remodel, patio cover), a budget worksheet and the questions to ask at the counter.](https://yespermit.com/handbooks/building-permit-fees-cost-handbook/)
- [Notice of Violation and Stop-Work Order Response Kit · $29 For the owner who found a notice of violation, a stop-work order or a citation about work done without a permit: what each paper means, the deadlines that start when it is served, the fines set by four state laws and published by 13 cities and counties, how a stop-work order is lifted, review, reductions and the hearing, the permit under an open case, closing the file and the lien, with four letter templates, a deadline calendar, a log of exchanges with the city and a worked example.](https://yespermit.com/handbooks/notice-of-violation-stop-work-order-response-kit/)
- [Window, Door and Egress Opening Permit Handbook · $29 For the homeowner who replaces windows or doors, cuts a new opening or widens one: when a same-size replacement needs a permit in ten named cities and counties, bedroom escape windows and the replacement exception, window wells, headers and studs, tempered glass in the seven hazardous locations, U-factor and SHGC by climate zone and under California's 2025 Energy Code, documents and fees, with a worked example, two letter templates and a window schedule.](https://yespermit.com/handbooks/window-door-egress-opening-permit-handbook/)
- [Outbuilding Electrical Permit Handbook · $29 For the homeowner who wants lights, outlets or a subpanel in a detached shed, garage, gazebo or barn: when the wiring needs its own permit even where the building needs none (15 cities and counties and 3 state electrical programs), who may pull it (the owner, the owner after an exam, or a licensed electrician), Maryland county by county, one circuit or a feeder, trench depths and conduit, the subpanel and ground rods, the trench, rough-in and final inspections, three worked fee examples, a checklist before the inspector and two letter templates.](https://yespermit.com/handbooks/outbuilding-electrical-permit-handbook/)

---

Source page: https://yespermit.com/handbooks/shed-permit-exemption-handbook/ · YesPermit, sold by LACANGEL GROUP SAS, 1 rue Marguerin, 75014 Paris, France. Prices in US dollars. YesPermit prepares permit applications; it is not an architect, engineer or law firm, and the city or county decides on every permit. Site summary for AI assistants: https://yespermit.com/llms.txt
